Text Box: Huge backlog of orders waiting for design release for customer approval
Still producing 2D drawings with offers
Constant friction with marketing for not being able to work on more offers
Management pressure for more productivity 
Invested a fortune in procuring expensive 3D design software licenses and training of design personnel and yet the design resources are not using the software for the purpose for complexity and time consumed 
Highly skilled expensive design resources are engaged in repetitive and monotonous job of designing each individual job (order) 
Cannot provide drawings for fabrication parts to respective vendors resulting in high percentage of inaccurate fabrication parts having to be rejected, yet paid for

Customer Success Stories

enabling people…

empowering business…

enriching society...

Text Box: Followed time consuming human performed iterative process of offering against enquiry/tenders performed by sales persons
Lack of digital data repository for orders executed and delivered
Lack of digital data repository for orders executed and delivered
No automated tool for material price update as per IEEMA and subsequent automatic pricing for new offers
No automated process for hierarchical approval processing and routing
Lack of a sales force tool for order execution status (design, production, testing, inspection, etc.) intelligence for continuous customer care and order based document management (offers, emails, reports, etc.)
Lack of a comprehensive automated solution for competitor analysis, competitive advantage, sales force effectiveness, prospect status, projection achievement, historical sales data, formatted reporting, etc.

+

Design Automation and Workflow Management

Customer:   One of the Largest Transformer Manufacturers in the World

Text Box: Practical problems faced by customer: 
Text Box: Studied the customers’ complete range of products (distribution transformers)
Categorized products by MVA ratings and considered one generic 3D model for each identified rating
Considered assemblies, sub-assemblies and corresponding individual components constituting each sub-assembly of parts.
Converted from 2D to 3D for each component using existing 3D software used by the customer
Developed 3D sub-assemblies, assemblies and models
Developed a hierarchical 3D Library system consisting of the developed 3D components and models
Customized the generic AD3D Software Framework to suite the 3DLib, capturing design logic and providing for GUI to input job specific inputs
AD3D uses inputs and works on selected model to design a job and generate 3D and 2D drawings for customer approval at the offer stage 
AD3D uses inputs and works on selected model to design a job and generate OGA, BOM, Material Schedule and Fabrication drawings
Text Box: AD3D & 3Dlib Solution Provided to customer:
Text Box: More orders for 3D OGA and dimensional drawings produced to customer with offer 
Reduced turn around time for customer approval of designs/drawings after order received
Happy vendors delivering more accurate fabrication jobs due to production of accurate fabrication drawings
Offer backlog reduced
Order backlog reduced
Deskilling of design process
Design personal are used for more complex problem resolution and R&D purposes
Happy internal customers in marketing and management
Text Box: Result to customer:
Text Box: Nominates the solution for its worldwide sustainable development award
Decides to implement the solution at its production facilities across the world
Text Box: Customer Reactions:

Enterprise Productivity Suite (Commercial)

Customer:   A Large Power Equipment   Manufacturer

Text Box: Practical problems faced by customer: 
Text Box: Database repository and easy status access and update of offers submitted and orders delivered
Generate General Technical Particulars sheet, Pricing sheet and Estimation Analysis sheet
Generate offer in prescribed format
Route and obtain hierarchical approvals through internal email system at pre-defined trigger points
Record order specifics and generate Commercial and Technical indent by back-end integration with ERP system
Track production status, Test results, Inspection results, Dispatch status, etc.
Provide customer requested status information from the system (can be integrated with Interactive Voice Response (IVR) system)
Perform better prospecting
Perform Sales force Effectiveness
Perform Business Analytics
Generate management reports
Text Box: E2D Software solution enabled the following:
Text Box: Sales force is freed up from repetitive and time consuming practice of manually preparing offers 
Offer accuracy increased due to referencing past orders and automated pricing update
Number of offers made per sales person increased substantially
Approval process is online and independent of location of approver
Easy document management and status updates has made offer and order tracking simpler
Happier customers
Better integration and communication with other departments
Text Box: Result to customer:

Result of depending on us with eyes closed...

Folded Corner: